The site records it once. The office copies nothing out again.
Why collecting data on a building site is so hard, how much time is lost in reporting and how industry software can give it back to the people who build.
The sector that documents the most, in the place where it is hardest to do.
- In a factory data is born next to a machine, under a roof, with a network. In construction it is born somewhere different every day: outdoors, in dust and rain, often with no connection.
- Yet construction must document a great deal: attendance, hours, machinery, materials, measurements, safety, photos, minutes, progress statements, variations.
- Collecting data is hard for physical, organisational and contractual reasons: the place, the people, the machinery and the conditions are always changing.
- Reporting is a burden because the same information is needed by many recipients, in different formats.
- The finished picture is a company where data is recorded once, on site, and reaches accounting, safety, the technical office and the client by itself.
- Site managers filling in daily reports by hand in the evening.
- Technicians copying measurements into the bill of quantities.
- Offices rebuilding hours and costs per site at month end.
- Works supervisors chasing documents to sign a progress statement.
Why we write about it. In construction the best software is the one the site manager actually uses, at seven in the evening, with dirty hands. Nexus starts there: process analysis, choosing and integrating industry tools, developing the missing pieces.
The companies of the construction world
A world made largely of small and medium-sized firms, often craft businesses, working together on the same site in different roles. Each has a different puzzle: pick yours.
New builds, renovations, public and private contracts
- Works accounting
- Progress statements
- Subcontracts
- Safety
- Job costs
On site almost nothing is fixed: the place, the people, the machinery, the conditions.
In a factory you can connect a machine and let it collect data for years. That is why automating data collection on site is much harder than in production.
Physical and environmental
- The place always changes: each site has a limited life, then you start from scratch
- No or unstable connection: basements, rural areas, reinforced concrete, newly opened sites
- A hostile environment for devices: dust, water, cold, knocks, gloves, dirty hands
- No fixed workstations: there is no "machine side"
People-related
- Data is recorded by whoever is working: they must stop work to write
- Very different digital skills in the crew, often language barriers too
- Changing staff: crews, seasonal workers, subcontractors and self-employed with their own tools
- Distrust of monitoring: geolocation and attendance touch privacy and the Workers' Statute
Organisational and contractual
- Many parties on the same site, each with its own systems
- Rented machinery and equipment moving between sites and companies
- Work that changes along the way: variations, surprises, time-and-materials work, verbal orders
- Measurements hard to automate: cubic metres, square metres, kilos of rebar measured by hand or from drawings
Technical
- Little "automatic" data: most activity does not generate data by itself
- Tools that do not talk: rental firm app, ERP, works accounting, safety software, technical office spreadsheets
In construction, digitalisation cannot rely on automation alone. It must make manual recording very fast (photos, voice, a few taps, offline use) and automate everything that comes after: calculations, reports, documents, submissions.
The exceptions are the few "automatic" data sources: machines with telematics, cranes and some recent equipment, environmental sensors, badges and access control systems.
The site that sends its daily reports: every person and every machine records on the spot, the office receives.
One fact on site, many documents in the office.
One hour of a worker's time is at the same time a job cost, a payroll figure, an entry for the site journal, a safety check and, in public works or with tax bonuses, an element in the labour adequacy check. Pick a fact and see where it must end up.
- Daily report
- Payroll
- Job costs
- Site journal
- Access control
- Labour adequacy
6 destinations, in different formats. Without integration, 6 transcriptions.
The obligations that generate documents
Public works accounting
Site journal, measurement book, accounting register, progress statements and final account, with digital programs in open formats guaranteeing authenticity and provenance. Below €40,000 simplified accounting is allowed.
BIM in public contracts
Digital information management methods compulsory for public works above €2 million; accounting documents must be interoperable with the models.
Site safety
Safety and coordination plan, each company's operating plans, prior notification, technical and professional suitability, coordinator's minutes, training and fitness of those present.
Credit-based licence
Compulsory for companies and self-employed workers on temporary or mobile sites; penalties tightened in 2025.
Site ID card and badge
Card already compulsory; a unique anti-counterfeiting code and a digital version interoperable with SIISL are added, once the implementing decree is adopted.
Labour adequacy
The labour share of the works value requires hours and workers to be correctly assigned to each site.
Building tax bonuses
Progress documentation, photos, sworn statements and consistency between work done, bills of quantities and invoices.
The hidden cost. In many firms reporting is done two or three times: the site manager writes the report on paper, the office copies it into the ERP, the technician reworks the same information for works accounting or for the client. Every step adds time, delays and errors. This is where software gives back the most value: record once, distribute to everyone.
The daily site report, from the phone
Fill in today's report for Residenza Le Querce: attendance and hours, machinery, delivery notes, photos, weather, a voice note. You can switch the network off: the report stays on the phone and goes out when the network is back. On the right you see where the same data arrives, without copying it out.
The same report, where it goes:
- Marco Rossi8.0 h
- Luca Ferri8.0 h
- Karim Diallo8.0 h
- Ionut Pop8.0 h
- Davide Neri8.0 h
- Labour40.0 h
- Machinery9.5 h
- Materials0 DDT
Workers: 1 site manager, 1 supervisor, 1 bricklayer, 1 formworker, 1 labourer
Equipment: ESC-07 6.4 h · GRU-02 3.1 h · MC-02 0.0 h
Supplies: —
Weather: Cloudy
40.0 h from 5 workers assigned to Residenza Le Querce
No delivery note photographed today.
No photos
Who is on site, for which company, with what training.
Many parties on the same site: main contractor, subcontractors, self-employed workers, rental firms. The identification card is already compulsory; Decree-Law 159/2025 adds a unique anti-counterfeiting code and the option of a digital card, interoperable with the SIISL platform, once the implementing decree is adopted. Linked to documents and training, it decides who gets in.
The site turnstile
It is 7 am at Residenza Le Querce. Tap each person's card: the system checks the card, the admitted company, the credit-based licence, DURC, training and fitness before opening. With "New arrival" you can build your own test case.
Tap a card from the list on the left.
Nobody yet
- Nothing to flag
Recording attendance and positions touches the GDPR and the Workers' Statute: notices and, where required, union agreements or authorisations are needed. Here requirements are checked at the gate, not people's positions while they work.
Attendance and access: who is on site, for which company, with what training.
- An area where they upload documents and certificates, with automatic deadline checks.
- Operating safety plans and the site safety plan linked to companies and planned work.
- Credit-based licence, training and fitness checked before entry.
- Link to access control, so only those in order get onto the site.
Every construction company has its own combination of pieces.
Recognising them is the first step to choosing the right tools. Pick a phase of the job to light up the pieces involved, or tap a piece to read it.
Phase 4 · Daily data collection. Attendance, hours per work item, machinery, materials received, photos, events, weather.
Smartphone report, offline too, in a few minutes at the end of the day; photos linked to the work item; delivery notes photographed on arrival; attendance from card or badge.
Paper daily reports
- What it means
- Hours, machinery and materials written by hand and copied out
- How it fits
- Smartphone report in a few taps, by voice or with photos too
- Job phases
- Software families covering it
- Site apps and daily reports
Each one covers some pieces well. None covers them all.
The market offers many vertical programs for construction, often bundled in suites. Here they are described by type, without product names: what matters is the puzzle pieces they cover, not the brand. Pick a family to see which pieces it covers.
Hours, machinery, materials, photos, events from a smartphone
- 2No connection
- 3Paper daily reports
- 6Machinery and rentals
- 7Materials and deliveries
- 11Photo documentation
- 22Site-office communication
Six kinds of tools, in practice
Technical suites for estimating and accounting
- Priced bills of quantities and works accounting, with price lists and a link to BIM models
- Online site journal and works supervision, filled in from site
- Modules for site safety and for the coordinator
Suited to: Technicians, works supervisors, firms on public contracts
Job management systems with a site app
- Daily reports, machinery, stores, journal, budget and management control, subcontracts
- Site report app linked to the ERP, useful for payroll and labour adequacy
- Different editions for small, mid-sized and larger firms
Suited to: Firms wanting to connect site, costs and administration
Platforms for documentation and defects
- Up-to-date floor plans and documents, comparable across versions
- Issues assigned to people or crews, with deadlines and reminders
- Photos, checklists, inspections and automatic reports with audit trail
Suited to: Firms and technicians wanting to get rid of paper and scattered messages
Site safety software
- Drafting safety and operating plans, simplified versions too
- App for the coordinator for minutes and inspections
Suited to: Safety coordinators, safety officers, firms writing their own operating plans
Vertical ERPs for construction
- They connect office and site on jobs, costs, purchasing and documents
Suited to: Construction SMEs looking for one tool for administration and jobs
International project management platforms
- Documents and drawings, requests for information, approvals, quality, safety
- Link with BIM models for complex projects
Suited to: Larger firms, big jobs, international partners
Almost every company uses two, three or more of these tools, often from different vendors, alongside the accounting ERP, the payroll software and access control. The problem is not a lack of software but that the tools do not talk to each other: hours from the daily report do not reach works accounting, photos do not reach the client's file, subcontractor documents do not reach access control.
Connecting these tools, or developing the missing piece, is what turns a set of software products into a digitalised company.
BIM and digital models: compulsory in large public contracts, useful in others.
The features listed are those typical of each kind of tool: individual products differ in coverage, integrations and cost and should be assessed at the time of choosing.
One day, before and after.
Access recorded, admitted companies and workers checked automatically
Photos and measurements linked to work item and floor plan, reports with an owner
Delivery note photographed and linked to the order
Smartphone report in a few minutes, offline too
The data is already in the ERP, in accounting and in job costs
Actuals ready, progress statement and accounting documents generated from collected data
Digital site file already complete
The order in which it comes together
- The digital daily report: the piece that frees up the most time and feeds all the others.
- Job costs linked to site data.
- Documents, photos and safety in the same site file.
- Works accounting and progress statements fed by recorded measurements.
- Resource planning, BIM and analytics once the basic data is reliable.
Every step immediately gives time back to the office and the site, and prepares the next one.
Work scheduling: crews and machines to distribute across several sites.
Machinery and rentals moving between sites.
Site storage and waste area.
Photo documentation: thousands of photos, finally in order.
The data is born on site and reaches the office by itself.
Screens from Nexus Cantiere: attendance, machinery, photos, model and scheduling share the same sites, people and work items. Pick a module and browse the three screens; click them to view full screen.
on site now at Residenza Le Querce, 19 of them subcontracted
access refused: card not recognised
documents expiring within 15 days, already flagged
Demo interfaces with sample data: companies, sites, people and values are invented.
The best software is the one the site manager actually uses.
At seven in the evening, with dirty hands. We start from there.
We listen to the owner, site managers, technical office and administration. We design data collection around the time and tools they really have on site.
We assess the industry software already in use or to be adopted, integrate it with the ERP, payroll, works accounting, safety and access control, and develop the missing pieces.
We start from the digital daily report or from the piece that hurts most, measure the time given back to the office and technicians, and grow step by step.
- Process analysisOn site and in the office: who records what, where things get copied out, which documents are produced and for whom.
- Choosing toolsWe help assess industry software against the company's puzzle pieces, with no ties to any single product.
- IntegrationSite apps, ERP, works accounting, safety, payroll and access control connected, so each piece of data is entered only once.
- Software developmentCustom apps and modules where standard products fall short: specific daily reports, site files, job dashboards, links between systems.
- Roll-out and supportTraining for site managers and office staff, support in the first weeks, adapting procedures.
- Simplicity on site: few taps, offline use, photos instead of writing.
- No double entry between site and office.
- Data owned by the company, independent of the vendor of any single product.
- Respect for privacy and worker-monitoring rules when collecting attendance and positions.
- Steps proportionate to the size of the company, from the craftsman to the general contractor.
In Emilia-Romagna the building site is already digital by law, from notification to price list.
Since 2013 the preliminary notification of building sites can only be filed online, on the regional SICO system, and the regional public works price list is updated every year. These are public data a digitalised company can link to its own instead of copying them.
first preliminary site notifications filed on SICO in 2024, 11.1% more than in 2023 1
accidents reported in construction in Emilia-Romagna in 2024 1
entry into force of the 2026 regional public works price list (Regional decision 2231 of 22 December 2025) 2
preliminary notification online only, on SICO, across the whole region 3
Modena
Reggio Emilia
Where we work. We are based in Modena and work on site with companies in the provinces of Modena, Reggio Emilia, Parma and Bologna. We also work with companies in other provinces and regions, remotely or with agreed visits: write to us from anywhere in Italy.
The questions we are asked most often.
14 questions
Why is it so hard to automate data collection on site?
Because the site changes place and people, often has no connection, and most activities do not generate data by themselves like a factory machine. That is why it pays to make manual recording very fast and automate everything that comes after.
What do you gain by digitalising daily site reports?
Copying out in the office disappears, you have hours, machinery and materials per site every day, and payroll, job costs, the site journal and labour adequacy checks are fed automatically.
Do site apps work without a connection?
Many industry apps let you work offline and sync the data when the network comes back. It is a requirement to check when choosing.
Must public works accounting be digital?
Yes. The Public Contracts Code (Legislative Decree 36/2023, Annex II.14) requires digital accounting programs using open formats that guarantee the authenticity and provenance of data. For works below €40,000 simplified accounting is allowed.
When is BIM compulsory?
In public works contracts worth more than €2 million, under Art. 43 of Legislative Decree 36/2023 as amended by Legislative Decree 209/2024. In private works it is not compulsory but it can link design, bills of quantities and progress.
What is the site badge?
It is the evolution of the identification card already compulsory on site: Decree-Law 159/2025 adds a unique anti-counterfeiting code and the option of a digital card, interoperable with the public SIISL platform. The new rules apply once the implementing decree is adopted.
Can software help with the credit-based licence?
It can help check that companies and self-employed workers admitted to the site meet the requirements, and keep training, fitness and safety documents in order, which reduces the risk of violations.
What kinds of construction software exist?
There are six main families: technical suites for estimating, accounting and the site journal; job management systems with a daily report app; platforms for site documentation and defects; safety software (safety and operating plans, coordinator); vertical ERPs connecting office and site; and international project management platforms linked to BIM. Each covers some puzzle pieces well, none covers them all.
Do you need one software for everything?
Rarely. Companies use several tools; the value comes when they are integrated and data passes from one to the other without being copied out.
Is digitalisation suitable for a small craft business too?
Yes. For a craftsman an app for daily reports and photos linked to the ERP or invoicing is often enough: it frees the evenings spent filling in forms and shows how much each site earns.
How are subcontractors managed?
With an area where they upload documents and certificates, automatic deadline checks and a link to access control, so only those in order get onto the site.
Can attendance be checked with geolocation?
With care: collecting data on workers' attendance and location must comply with the GDPR and the Workers' Statute, with privacy notices and, where required, union agreements or authorisations.
Why choose Nexus?
Because we start from how the site and the office really work, help choose industry tools with no ties to a single product, integrate them with each other and with company systems, and develop the missing pieces.
How is a preliminary site notification filed in Emilia-Romagna?
Online only, on the regional SICO information system, compulsory across the region since September 2013. In 2024 there were 42,072 first notifications, 11.1% more than in 2023. The notification data (client, companies, dates, amounts) are the same ones needed on site and in the office: it pays to enter them once and reuse them.
The words of the digital site, explained in one line.
- Daily report
- Daily record of hours, machinery, materials and events on a site, filled in by the site manager.
- Site journal
- Works supervision document recording progress, workers by grade, equipment, supplies, events, service orders, suspensions and variations.
- Measurement book
- Record of quantities carried out, the basis for accounting and progress statements.
- SAL (progress statement)
- Statement certifying the work carried out in a period, allowing it to be paid.
- Bill of quantities
- List of work items with quantities and prices, the basis of the estimate and accounting.
- DDT (delivery note)
- Transport document accompanying materials delivered to the site.
- PSC and POS
- The site safety and coordination plan and each company's operating safety plan.
- Credit-based licence
- Requirement for companies and self-employed workers on temporary or mobile sites, since 1 October 2024.
- Identification card
- Compulsory card for anyone working on site; Decree-Law 159/2025 adds a unique code and a digital version.
- Labour adequacy
- Check of the labour share of the works value, with hours and workers assigned to each site.
- Time-and-materials work
- Work paid by hours and materials rather than by measured quantity, often unplanned at the start.
- BIM
- Building Information Modelling: an information model of the works that can be linked to bills of quantities, progress and documents.
- Rental with operator
- Hire of a machine together with its operator.
- As-built
- Documentation of the works as actually built, the basis for maintenance.
The rules cited in this guide.
- Legislative Decree 36 of 31 March 2023 (Public Contracts Code), Art. 43 and Annex I.9 (digital information management), Annex II.14 (works supervision and accounting), as amended by Legislative Decree 209 of 31 December 2024.
- Legislative Decree 81 of 9 April 2008, Title IV (temporary or mobile sites), Arts. 18, 26 and 27 (identification card, credit-based licence).
- Decree-Law 159 of 31 October 2025, Art. 3 (site badge with unique anti-counterfeiting code).
Note. Information updated 16 November 2026. Rules and products change often: check the current text and the latest software features before any decision.
How many hours does your office spend copying out daily reports?
Tell us how you collect hours, machinery, materials and measurements today: we will show you how to record them once on site and turn them automatically into costs, documents and progress statements. We reply in person, usually within one working day.